24 May 2009

digging again

Excavation has begun again outside to pour the footings for the driveway retaining walls:


The front door has been installed:

The tile in the entryway has gone down:


The drywall and cement board around the fireplace has been installed:


As well as the drywall around the stairwell:


The first plumbing fixture has been installed in the ensuite (a happy toilet):


And, also in the ensuite, the structure is going in for the millwork: