01 March 2009

interiors

The last of the windows went in a couple of weeks ago, and the waterproofing on the roof terraces went on, so the house is now more or less waterproof and ready for the work to really start inside.


The tubing for the in-floor heating went into the lower level.

The concrete was poured and trowelled - hopefully to a nice smooth finish.


The rest of the interior framing is going up. This is a view on the master bedroom level in the stairwell looking towards the dining room (below) and the pop-up study (above).


A view from the kitchen looking into the stairwell (with temporary construction stairs).



No comments:

Post a Comment