twenty-seven down, two to go

The windows have been steadily popped into place over the past couple of weeks.

Some have taken more effort than others.


The heaviest and highest window was being craned over the house this morning when I arrived on site, and this is the moment, peering over the second floor while the guys were struggling to get it into place, when I realized that Loewen had built it incorrectly. The sliding door should be on the right hand side, not in the centre. Some poor guy in the factory just couldn't handle the asymmetry. Next week Loewen will come to take it apart and put it back together the right way.



Here's another one going up and over the house.