25 January 2009

one down, twenty-eight to go

The first of the windows was in on Friday, and there should be lots more by now....


and most of the interior framing was done in the master bedroom and laundry room.


The electrical panel is in...


and the framing at the back of the house is now ready for the big windows.




No comments:

Post a Comment